News

  Mobile site   RSS   Podcasts

Система Orphus
  • 11.09.2015 18:25    Rubrics:  HAU  Tourism  
  • Viewing platform in Prechistenskaya Embankment is assembled

  • This week the builders have completed to concrete the main viewing zone that is being erected within the framework of the Prechistenskaya Embankment reconstruction. The platform in the shape of a semicircle is situated opposite the Governor’s House right at the water’s edge.

    “Now they continue making the solid-cast headwall that is to protect the bank from slumping during spring flood. It has been already built at the section from the footbridge to the viewing platform. At present we are concreting it in the direction to the mouth of the Sodema River. The stairs from the side of Lermontov Street have been already constructed, the others are being completed”, said Alexey Sharopaev, chief engineer of the contracting company - LLC “Magistal”.

    In all, there will be fours staircases in the renovated embankment. It will have two levels at the mouth of the Sodema River. Pavements will be cubed and the slopes - pebbled. New street lamps and benches will be installed there.

    It is worth reminding that the reconstruction of the Prechistenskaya Embankment is a part of the tourist project “Nason-City”. Its main aim is to unite all sights located in the historical part of Vologda in a single walking tour. Considerable means for the embankment beautification are channeled from the federal budget.

Alyona Zakataeva

Rating    

0

 Votes: 0 ( + 0 / - 0 ).

Subscribe